FEATURED PROJECTS

Peptisyntha, Inc., Torrance, CA

IESCO, Torrance, CA

Best Western, West Hollywood, CA

Holiday Inn Express, Carpinteria CA

Travel Lodge, Santa Monica, CA

Holiday Inn, Laguna Beach, CA

Holiday Inn Express, Dana Point, CA

Ocean View Baptist Church, San Pedro, CA

 

PEPTISYNTHA, INC., TORRANCE, CA

This facility is located in Torrance, CA and it was incorporated in 2001, and is wholly owned subsidiary of Solvay America Inc. They are The Leading Producer of Therapeutic Peptides for Pharmaceutical and Biotech companies in the United States.

20910 Higgins Court in 2005
Bilan Construction expanded the existing laboratory by adding ~3000 square feet of two suites compliant for manufacturing large scale Active Pharmaceutical Ingredients (APIs).  This expansion was needed  to increase the production capacity.

20915 Western Avenue
In 2009, Bilan Construction renovated existing building to add  Quality Control, Administrative offices, Shipping area, and facility Storage  ~ 6,800 square feet

IESCO, TORRANCE, CA

The projects completed in 2008 at IESCO include the construction of Two-story office space, New IT, Training, and Document storage room as well as remodeling of existing offices..

BEST WESTERN, WEST HOLLYWOOD, CA

Located in the heart of West Hollywood on the legendary Sunset Strip

Renovated Hotel Lobby, Breakfast Area, Courtyard, and over 100 Rooms

HOLIDAY INN EXPRESS CARPINTERIA, CA

Located in Downtown Carpinteria a classic California Coastal Town

Construction of breakfast patio awnings, installation of wet bars in guest rooms and renovation of new breakfast bar to accommodate hotels’ new brand requirements

TRAVELODGE, CA

Located near Los Angeles International Airport

In 1995, we were contracted to renovate a 1950 Hotel building. Construction involved the configuration of 40 hotel rooms into 24 guest rooms including construction of breakfast area, kitchen new bathrooms for all guest rooms.

Another major renovation took place in 2004 that involved all 84 guestroom. Renovation involved were installation of new plumbing, new energy efficient doors, windows and ceilings, new bathroom fixtures, new stone tile and bathtub surrounds. A Guest coin operated laundry room was also relocated to maximize storage space at the hotel.

In 2007, one guest room was converted into a commercial laundry facility to provide linen to the hotel with practically no noise or vibration being detected in the neighboring guestrooms.

HOLIDAY INN, LAGUNA BEACH, CA

Located in the heart of Laguna Beach along Pacific Coast Highway, 1 Block inland from the beach.

Renovated Front Lobby and Hotel Courtyard

HOLIDAY INN EXPRESS, DANA POINT, CA

Located along Pacific Coast Highway near Dana Point Harbor, Doheny St. Park & Beach

Repaired and re-roof major section of the building, replaced Travertine floors, fire doors, parking lot repairs and exterior decks.

OCEAN VIEW BAPTIST CHURCH, SAN PEDRO, CA

The construction project was a build-out of ~5, 500 square feet of new 2 stories Youth Centre. The New “Youth Center” is a community based to serve the children and families of San Pedro.